If the display on the electricity meter fails, in most cases it can no longer be used. This is also the case with numerous Holley brand electricity meters. The network operators have to replace them due to a defect.
Electricity meters in Germany are to be replaced with so-called digital smart meters by 2032. But these not only bring advantages for the customers, as a case from the Holley brand shows.
Because the Holley brand electricity meters with the type designation DTZ541-ZEBA have major problems with their digital displays. As EWE reportsaround 25,000 Holley brand electricity meters need to be replaced by the energy company’s customers alone.
Holley electric meters do not show meter readings
The problem with the electronic displays occurs after only a short period of operation, like this Northwest Newspaper reported. Customers will then no longer be able to read the meter reading.
The energy company EWE therefore wants to replace all devices as a precautionary measure. like a spokesman for the Northwest Newspaper says. To do this, the network operator will contact the affected customers with suggested appointments.
However, this could take a few weeks, as the network operators are already changing a lot of meters and the defective devices are also being added. According to the Baden-Württemberg network operator Syna, there is already an “overload situation” here. like it is in the Stuttgart News is called.
This is how the network operators determine the meter reading
If the electricity meter does not show a meter reading, the network operators cannot of course determine the electricity consumption. EWE wants to use estimates for this, the company spokesman said.
The company will calculate the meter readings in accordance with the relevant legal and technical regulations. “The calculation is based on the previous consumption values or consumption forecasts of the respective customer available to us,” it says.
According to the municipal utilities in Backnang, Baden-Württemberg, consumption can in many cases be read out via the optical interface. This also works despite the broken displays, as Stadtwerke managing director Thomas Steffen told the Stuttgarter Nachrichten.
Solar power can also be included
For customers with a balcony power plant or a larger PV system, the electricity they produce themselves should also be included in the calculations. For example, the number of measured hours of sunshine could be used for this purpose.
If the PV system has an app, the electricity generation values recorded in it can also be included. In many places, customers can simply submit a screenshot.
Also interesting:
- About electrical impulses: Cutlery is supposed to make food saltier
- “Virtual power plant”: This is how electric cars can relieve the burden on the power grid
- Fuel alternative: Sunlight trap reaches up to 1,000 degrees Celsius
- For over 1 million households: Germany’s largest wind farm is being built in the North Sea
The article After a defect: Tens of thousands of Holley electricity meters have to be replaced by Maria Gramsch first appeared on BASIC thinking. Follow us too Facebook, Twitter and Instagram.
As a Tech Industry expert, I believe that the situation with the Holley electricity meters is concerning and poses a significant challenge for both consumers and utility companies. The need to replace tens of thousands of defective meters is not only a logistical and financial burden, but also raises questions about the quality control and testing processes in place during the manufacturing of these meters.
It is crucial for companies in the tech industry to prioritize quality assurance and reliability in their products to prevent such defects from occurring in the first place. In this case, it is important for Holley to take swift action to rectify the issue and ensure that the replacement process is efficient and transparent for affected customers.
Moving forward, it is essential for Holley and other companies to learn from this incident and implement more rigorous testing procedures to prevent similar defects from happening in the future. Trust and confidence in technology products are paramount, and addressing defects promptly and effectively is crucial in maintaining a positive reputation in the industry.
Credits